Remediation Services

  • Phytoremediation
  • Bioremediation
  • Accelerated Chemical Remediation

Environmental Consulting

  • Site Clean-up Evaluation
  • Cost Effective Solutions for Environmental Contamination
  • Permitting

Sustainable and Environmental Planning

  • Sustainable and Environmental Planning
  • Smart Growth Plan Development
  • Strategies for Reducing Stormwater and Ambient Air Pollution
  • Development Services
  • Education for Developers and Policy Makers

Environmental Engineering

  • Green Building Design
  • Low Impact Developments
  • Energy Efficient Systems Integration
  • Water Conservation and Efficiency
  • Improved Indoor Air Quality

We accept government credit cards


GSA

Business Type
8(a), HubZone Certified
Small Disadvantaged Business
Minority Owned Business

General Services Administration
Federal Supply Schedule Industrial Group 899
SIN 899-8 Remediation Services and 899-8RC   


Contract Number
GS-10F-0090S
GSA Contracting Officer

Ms. Tonja Ferguson
400 15th Street SW, Room 2757
Auburn, WA 98001-6599
253-931-7914

Contractor Information:

Planteco Environmental Consultants, LLC

337 South Milledge Avenue, Suite 202
Athens, Georgia 30605
706-316-3525 (phone)    706-353-9270 (fax)

Order Contact Information:

Cathy Knudsen, Contract Administrator
This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Grace Gray Operations Manager
This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Valentine Nzengung, President & CEO
This e-mail address is being protected from spambots. You need JavaScript enabled to view it


Table of Contents

•    SIN 899-8: Remediation Scope of Work
•    GSA Schedule Rates
•    Company History
•    NAICS Codes
•    Products and Services
•    Federal Experience
•    Environmental Staff

SIN 899-8: Remediation Scope of Work

Remediation services include, but are not limited to
•    Containment, monitoring and/or reduction of hazardous waste sites
•    Munitions and Explosives of Concern (MEC) removal and disposal
•    Long Term Monitoring/Long Term Operation (LTM/LTO).
•    Site preparation, characterization, field investigation, conservation and closures
•    Wetland restoration
•    Emergency response clean up (ERC)
•    Underground storage tank/above-ground storage tank (UST/AST) removal
•     Air monitoring
•    Soil vapor extraction
•    Stabilization/solidification, bio-venting, carbon absorption, reactive walls, containment, monitoring and/or reduction of hazardous waste sites, as well as unexploded ordnance removal
•    Remediation-related laboratory testing (e.g., biological, chemical, physical, pollution and soil testing). Reclamation services include, but are not limited to: Land (e.g., creating new land from sea or riverbeds and/or restoring areas to a more natural state, such as after pollution, desertification, or salination have made it unusable)


GSA Schedule Rates (Current Year April 2010 – April 2011)

Labor Category GSA Hourly Rates
Program Manager
$88.61
Principal Engineer/Scientist
$83.69
Project Manager$71.75
Administrator 
$43.18
Senior Technician$66.10
Technician$55.71
Administrative Assistant$40.48
Truck Driver$41.39
Equipment Operator 
$47.70


Equipment GSA Daily Rate
Excavator$525.00
Trencher (Walk Behind)$78.75
Trencher (Ride On)
$210.00
Skid Steer Loader$162.75
Backhoe 
$210.00
Trackhoe (½-CY Mini)
$220.50
Track Loader (1¼-CY) 
$456.75
Dozer 
$850.50
Field Tractor 
$189.00
Dump Truck (15-CY)
$1,097.25
Fuel Storage$52.50
5 KW Generator Minimum
$73.50
50 KW Generator Minimum
$278.2
3,000 PSI High Pressure Washer$89.25
Air Jackhammer with Bit and Hose$47.25
Electric Jackhammer with Bit
$78.75
Compressor 185 CFM, Gas Powered$99.75
Concrete Saw with Blade$63.00
2-Inch Discharge$52.50
3-Inch Discharge
$68.25
8-Inch Discharge$262.50
Welder/Supplies/Fuel
$73.50
Standard Auto/Pickup Truck$57.75
One-Ton Truck
$68.25
MiniRAE 2000 with 10.6 eV Lamp$78.75
Foxboro TVA 1000 Vapor Analyzer - PID/FID$131.25
MSA Model 360 LEL/02/CO
$52.50
Andersen TSP High Volume Air Sampler
$131.25
Andersen (PUF) Polyurethane Foam System$78.75
Gilian GilAir-3 Air Sampling Pump
$21.00
Low Flow Module
$5.25
Gilian Gilibrator Air Flow Calibrator$26.25
BIOS Dry Cal DC-Lit Calibrator
$26.25
Jerome 431X Mercury Vapor Analyzer
$10.50
Drager Accuro Hand Pump
Solinst 101, Heron Dipper-T Water Level meter
$31.50
Solinst 122 or Heron H.01L Interface Probe 300'$47.25
Buddy Portable Product Spill Pump - 100’ Hose
$78.75
Grundfos Redi-Flo2 2" Pump 300' with Controller
$99.75
Soloinst Peristaltic Pump - Model 410$26.25
QED Micropurge Basics MP10 H Controller$105.00
Global FP 201 Water Flow Probe$36.75
YSI 6920 Multi-Parameter Water Quality System$157.50
Horiba U 22 Water Quality Monitoring System w/Flow Cell
$105.00
YSI 556 Multi-Parameter System$105.00
YSI 55 DO/Temperature Meter$26.25
HACH Turbidity Meter$26.25
Tripods Rescue System$105.0
Confined Space Blower$36.75
Quest Q300 Data Logging Dosimeter Noise
$36.75
Quest 2700 Sound Level Meter$36.75
Quest Temp II Heat Stress Meter$36.75
Quest Temp 34 Thermal Environmental Monitor 
$36.75
Global Positioning System Timble Pro XRS GPS$210.00
2-Way Radio$10.50
Laser Level (Tripod, Rod, Laser Level)
$52.50
Davis Weather Station$47.25
Ludlum Model Radiation Survey with GM Pancake Detector$36.75
Ludlum Model 3 Survey Meter with 43-1 Alpha Scintilator
$36.75
Power Auger
$84.0

Company History

PLANTECO Environmental Consulting, LLC takes an integrated, multidisciplinary approach to environmental engineering challenges - from permitting and regulatory compliance to site investigation and remedial design, all the way through to engineering, construction, cleanup, and operation and maintenance. We provide clients with full-service engineering capabilities for environmental site assessments, management and remediation. These capabilities include waste management strategies, site remediation, remedial system design and installation, and negotiations with regulatory agencies.


PLANTECO ENVIRONMENTAL CONSULTANTS, LLC, was founded in 2000 and is an 8(a), HUBZone, Small Disadvantaged Business (SDB), as registered in the CCR. PLANTECO is an innovative technology leader. We provide sustainable technology consulting, feasibility studies, basic research, applied research, proof-of-concept, pilot testing, and full-scale deployment of turnkey innovative remediation, and engineered green remediation product applications.

PLANTECO provides services for remediation of soil, surface and groundwater, sediments, and air.  We have developed and demonstrated multiple cost-effective, sustainable, and innovative green remediation technology applications for the cleanup of organic and inorganic contaminants. The success of our comprehensive lab-to-field approach for phytoremediation, in situ bioremediation, and subsurface redox manipulation technologies has been clearly demonstrated in a wide range of government and industry projects, as detailed on PLANTECO’s web site (www.PLANTECO.com).

PLANTECO is working on the cleanup of recalcitrant petrochemicals (including oil spills), petroleum hydro-carbons related to underground storage tanks, chlorinated solvents, metals and emerging contaminants of concern such as perchlorate, NDMA, 1,4-dioxane, munitions and explosives components (MECs), munitions constituents of environmental concern, and wastewater at sites in the Unites States and internationally. We are also assisting military bases in the maintenance and operation of their Land Application Systems (LAS) for treatment of wastewater. Members of PLANTECO’s team have many years of experience in performing site evaluations, feasibility studies, long-term monitoring, and remediation design and implementation at many federal and state field sites throughout the United States.

Our successful approach to these projects is focused on meeting the client's requirements and is underpinned by our strategic approach to address the site issues, public health, regulatory agency concerns and cost impacts. We have repeatedly demonstrated our ability to negotiate effectively, prepare and execute focused work plans, and apply unbiased technologies and approaches.

PLANTECO NAICS Codes as registered in the CCR


NAICS Code - Description

484220 - Specialized Freight (except Used Goods) Trucking, Local

484230 - Specialized Freight (except Used Goods) Trucking, Long-Distance

541330 - Engineering Services

541370 - Surveying and Mapping (except Geophysical) Services

541611 - Administrative Management and General Management Consulting Services

541614 - Process, Physical Distribution, and Logistics Consulting Services

541618 - Other Management Consulting Services

541620 - Environmental Consulting Services

541690 - Other Scientific and Technical Consulting Services

541712 - Research and Development in the Physical, Engineering, and Life Sciences

541990 - All Other Professional, Scientific, and Technical Services

561210 - Facilities Support Services

562119 - Other Waste Collection

562910 - Remediation Services

611430 - Professional and Management Development Training

611519 - Other Technical and Trade Schools

Products and Services


Groundwater and Soils
•    Rapid chemical degradation of munitions constituents in soil, groundwater, pinkwater, and metal casings using MuniRem
•    Bioremediation of hydrocarbons, creosote, chlorinated solvents, pesticides, perchlorate, nitrates, munitions/explosives, acid mine drainage
•    Design, installation, assessment and enhancement of Phytoremediation
•    Monitored natural attenuation
•    Mulch biobarriers

Wastewater and Other Surface Waters
•    Microbial mat aquatic treatment system to produce reusable water
•    Constructed Treatment Wetland design and installation
•    Limestone Buffered Organic Substrate (LBOS)

Research & Development and Feasibility Tests
•    Nano-composites for filtration of contaminants from drinking and wastewater
•    Bench-scale feasibility/treatability studies
•    Fate and transport of contaminants
•    Characterization of soil minerals and properties

General Environmental Consulting
•    Green Building and Energy Efficiency
•    Alternative Landfill Cap design, installation and management
•    Underground Storage Tank (UST) removal and remediation
•    Long-term monitoring
•    Modeling and Simulations
•    Phase I and II site assessments
•    Brownfields
•    Erosion control
•    Litigation support

Federal Experience

PLANTECO and its staff have decades of experience working for federal agencies including:

• U.S. Army Corps of Engineers            • U.S. Air Force
• U.S. Army                                       • EPA Regions 2,4
• U.S. Navy                                        • U.S. Dept. of Energy
• U.S. Department of Agriculture          • National Guard (various states)
• U.S. Department of Transportation     • U.S. Public Housing Authority
• GSA

Environmental Staff

PLANTECO’s senior level engineers and scientists have over 20 years of experience with environmental issues. Our staff has experience managing and conducting environmental projects in nearly all states and internationally.  This provides knowledge of local issues, requirements, and conditions.  It also gives PLANTECO the experience base to provide unique approaches and solutions to environment issues.

 
 

Contract number: GS10F0090S

Clients

  • Department of Defense (DOD)
  • Environmental Protection Agency (EPA)
  • DOE
  • DOC
  • DOI
  • Department of Transportation (DOT)
  • GSA